HomeTopics

A conditioning sequence has 5 rounds, each with 45 seconds work plus 75 seconds rest, including rest after the final round. What total time is planned in minutes?

  1. A6.0 min
  2. B8.8 min
  3. C10.0 min
  4. D6.3 min
Show answer and explanations

Answer

C

5 × (45 + 75) = 600 s; 600 ÷ 60 = 10.0 min, with the last rest included as stated.

A

6.0 min divides 600 s by 100, a decimal-minute slip.

B

8.8 min (525 s) subtracts the final 75-second rest, although the stem includes it.

D

6.3 min (375 s) counts the five rest periods and omits the 45-second work bouts.

C

5 × (45 + 75) = 600 s; 600 ÷ 60 = 10.0 min, with the last rest included as stated.

Free questions

ID: NSCA-156