HomeTopics

A client trains near an unsecured bench that shifts during setup. What should happen before the exercise continues?

  1. AContinue at a lighter load while the trainer watches the bench closely
  2. BStop and secure or replace the bench before loading
  3. CLog the problem and report it to facility staff after the session
  4. DWedge a weight plate under the short leg
Show answer and explanations

Answer

B

Unstable equipment must be secured or replaced before the exercise continues; load reduction or client bracing does not remove the hazard.

A

Closer supervision and a lighter load do not stop the bench from shifting; the hazard remains until it is secured or replaced.

C

Reporting is appropriate, but waiting until after the session means the client keeps training on a bench known to shift.

D

An improvised wedge is not a reliable fix and can slip under load.

B

Unstable equipment must be secured or replaced before the exercise continues; load reduction or client bracing does not remove the hazard.

Free questions

ID: NASM-268